We work as an official distributor of Riello UPS. Our engineers size the topology, redundancy and battery technology against your critical load and tolerable outage window — not against a generic catalog spec.

Our Products

Riello UPS Sentinel Dual2 (SD2) 1–3 kVA

Single-phase online (double-conversion) UPS family for servers, storage systems, VoIP and network equipment, medical systems and industrial applications, rated 1,000–3,000 W, in a 2U rack or tower format with hot-swappable batteries; ER versions are available for extended runtime. Manufactured by Riello UPS.

Output power factor
1.0 (1000 / 1500 / 2200 / 3,000 W)
Topology
online, double-conversion; VFI-SS-111 (IEC 62040-3)
Efficiency (online mode)
max 93.7%
Efficiency (ECO / SMART ACTIVE mode)
98%

Riello UPS Sentinel Dual (SDU) 4–10 kVA

Single-phase-output online (double-conversion) UPS family for server rooms, network equipment, security and electro-medical devices, rated 4–10 kVA, in rack or tower format with hot-swappable internal batteries; three-phase-input versions are available at 8–10 kVA. Manufactured by Riello UPS.

Output power factor
1.0 (kW = kVA) for SDU 5000–10000; SDU 4000: 0.9 (4,000 VA / 3,600 W)
Topology
online, double-conversion; VFI-SS-111 (IEC 62040-3)
Efficiency (online mode)
max 95%
Efficiency (ECO mode)
max 98%
Input THDi
≤2%
Parallel capability
max 3 units, capacity or N+1 redundant, with optional parallel card (SDU 4000 cannot be paralleled)

Riello UPS Sentryum 10–120 kVA

Transformer-free online (double-conversion) UPS family for small data centers and electro-medical, industrial and transport critical loads, rated 10–120 kVA/kW with three-phase output and 10–20 kVA/kW with single-phase output, with a three-level IGBT inverter and internal battery space up to 60 kVA. Manufactured by Riello UPS.

Output power factor
1.0 (kW = kVA), up to 40 °C
Topology
online, double-conversion, transformer-free; VFI-SS-111 (IEC EN 62040-3)
Efficiency (online mode)
max 96.6% (series-level value)
Efficiency (ECO / SMART ACTIVE mode)
max 99%
Input THDi
≤3%
Parallel capability
max 8 units, N+1 redundant or capacity (three-phase-output S3T models)

Riello UPS Sentryum Rack (SRM / SRT) 20–160 kVA

19″ rack-mount modular online (double-conversion) UPS family for industrial processes and electro-medical, emergency and transport critical loads, built from 20 kVA/kW, 9U modules and scalable to 160 kVA/kW, with single- or three-phase output, external batteries and modules replaceable from the front. Manufactured by Riello UPS.

Output power factor
1.0 (kW = kVA), up to 40 °C
Topology
online, double-conversion; VFI-SS-111 (IEC EN 62040-3)
Efficiency (online mode)
max 96.3%
Efficiency (SMART ACTIVE mode)
max 99%
Input THDi
≤3%
Parallel capability
max 8 modules, 160 kVA/kW in total; max 3 modules per cabinet (60 kVA/kW), with a parallel kit per module

Riello UPS Multi Power2-M2X 15–120 kW

Modular three-phase online (double-conversion) UPS system for small data centers and critical applications, built from hot-swappable 15 or 30 kW, 2U power modules, up to 120 kW per cabinet, as a power cabinet or a Combo cabinet that also houses batteries. Manufactured by Riello UPS.

Output power factor
1.0 (ratings given in kW)
Topology
online, double-conversion, modular; VFI-SS-111 (IEC 62040-3)
Power module
15 kW (M2X 15 PM, M2X 15 PM BLUE) or 30 kW (M2X 30 PM BLUE), 2U
Efficiency (online mode)
max 98%
Input THDi
<3%
Parallel capability
max 6 units; max 480 kW in total (M2X 120 cabinets) or 360 kW (M2X 90 CBC 4)

Riello UPS Multi Power2 (MP2) 300–600 kW

Modular three-phase online (double-conversion) UPS system for data centers and for industrial and transport loads that require continuous power, up to 300, 500 or 600 kW per cabinet, built from hot-swappable 67 kW, 3U power modules, with external batteries. Manufactured by Riello UPS.

Output power factor
1.0 (kW = kVA)
Topology
online, double-conversion; VFI-SS-111 (IEC 62040-3)
Power module
67 kW, 3U: MP2 67 PM (IGBT) or MP2 67 PM BLUE (SiC); VE cabinets and the MP2 300 PCM with top ventilation require BLUE power modules
Efficiency (online mode)
max 96.5% with IGBT module; max 98.1% with BLUE (SiC) module (top-ventilated MP2 600 VE: max 98%)
Input THDi
<3%
Parallel capability
max 6 systems, 3,600 kW in total

Riello UPS Multi Power2 Scalable (M2S) 1,000–2,000 kW

Modular three-phase online (double-conversion) UPS system for large data centers and other critical facilities, also designed for rapidly fluctuating AI load profiles, up to 1,000–2,000 kW per unit, built from hot-swappable 67 kW, 3U power modules, with external batteries. Manufactured by Riello UPS.

Output power factor
1.0 (ratings given in kW)
Topology
online, double-conversion, modular; VFI-SS-111 (IEC 62040-3)
Power module
67 kW, 3U: MP2 67 PM (IGBT) or MP2 67 PM BLUE (SiC); the M2S 2000 and every top-ventilated version with BLUE modules only
Efficiency (online mode)
max 96.5% with IGBT module; max 98.1% with BLUE (SiC) module
Input THDi
<3%
Parallel capability
max 4 units; max 4000 / 5000 / 6400 / 8,000 kW in total (M2S 1000 / 1250 / 1600 / 2000)

Riello UPS NextEnergy (NXE) 250–800 kVA

Transformer-free three-phase online (double-conversion) UPS family for data centers, communication networks and the critical loads of commercial and industrial facilities, rated 250–800 kVA/kW, with three-level IGBT technology, external batteries and a peak shaving function. Manufactured by Riello UPS.

Output power factor
1.0 (kW = kVA), up to 40 °C
Topology
online, double-conversion, transformer-free; VFI-SS-111 (IEC 62040-3)
Efficiency (online mode)
max 97%
Efficiency (ACTIVE ECO / ECO mode)
98.5% (ACTIVE ECO); 99% (ECO)
Input THDi
<3%
Parallel capability
max 8 units, capacity or N+1 redundant; common or separate battery

How to Choose a UPS System?

Selecting the right UPS is rarely a single-parameter decision — typically 4-6 criteria need to be weighed together. The questions below help frame the procurement and the technical specification.

Capacity and scalability

Plan headroom on top of the present load for future growth. Inrush currents are not covered by this headroom: check them against the overload curve in the selected model's datasheet and against the bypass path. A modular system can be expanded later, without downtime in configurations supported by the manufacturer — depending on the cabinet's module slots and the site's electrical design; a smaller initial configuration is a valid starting point if growth is predictable.

Topology (online / line-interactive / offline)

In normal operation an online (double-conversion) UPS supplies the load from the inverter, so it continuously regulates voltage and frequency (this does not apply in ECO or bypass mode) — for data centers and sensitive industrial controls this is the typical choice; in hospitals the topology must be determined by the loads to be supplied, the room classification and the project requirements. Line-interactive UPS is sufficient for office and smaller industrial loads. Offline (standby) topology is only justified for the smallest non-critical loads.

Backup time (autonomy)

Ranges from a few seconds to several hours — the required runtime drives the size and chemistry of the battery bank (AGM, GEL, OPzV, LiFePO4). If a generator (genset) is also part of the chain, the UPS only has to bridge the transfer, not provide long backup.

Redundancy level (N+1, 2N)

For data centers, banking systems and critical hospital loads, N+1 or 2N redundancy is typically considered, depending on load criticality and project requirements. 2N (two independent power paths) is one possible design for fault-tolerant infrastructure; a Tier classification applies to the infrastructure of the entire facility and does not follow from the UPS topology or from an availability SLA. The two independent paths can significantly increase capex — we estimate the difference from the complete electrical design — so the redundancy level should be driven by the risk assessment and the maintainability requirement.

Communication and monitoring

SNMP and Modbus cards integrate the UPS into existing DCIM, BMS or SCADA systems. Temperature probes, dry contacts and shutdown modules belong in the original quote — retrofitting them is typically more expensive.

Lifecycle service

Batteries typically have a shorter service life than the UPS; we plan replacement based on the manufacturer's design life (not a guaranteed service life) and measured capacity. Capacity testing (Cn), preventive maintenance (PM) and UPS retrofit options are worth discussing before purchase, not after the warranty expires.

Decision guide

SituationRecommended solutionWhyNext step
Server room, network equipment, smaller critical loads Single-phase-output online UPS (1–10 kVA) Small footprint, rack or tower format Request a quote
Data center, sensitive industrial controls, critical hospital loads (per project requirements) Online (double-conversion) UPS with N+1 or 2N redundancy per the risk assessment Continuous voltage and frequency regulation in normal operation Uninterruptible power supply
Predictable load growth Modular UPS with a smaller initial configuration Capacity can be expanded without downtime in manufacturer-supported configurations Design and installation
Longer backup without a generator Larger battery bank (AGM, OPzV or LiFePO4) Backup time drives battery size and chemistry Industrial batteries
Existing, aging UPS installed base Preventive maintenance, capacity testing, retrofit Battery life is shorter than UPS life UPS maintenance

The Energom advantage

  • 25+ years of UPS sizing and design — from data centers to rail.
  • Sizing advice across the full Riello UPS range, from 1 kVA to 2,000 kW.
  • In-house service team. Standard, Premium and 24/7 SLA levels; fault reporting, response time and on-site arrival time are set per level and per site in the individual contract.

Request a Custom Quote

Unsure about sizing? Our engineers design custom configurations after an on-site survey; request a quote or a callback using the buttons below.

Request a Quote Request a Callback

We respond to quote requests within 24 hours on business days and return callback requests within 4 business hours.