EV Charging Infrastructure for Corporate Fleets, Shared and Commercial Environments

A corporate fleet's or commercial parking facility's charging network is not a simple charger installation — fleet size, charging cycle, grid capacity and OCPP-based management together determine success. With 25+ years of power supply experience and an energy-storage-integrated solution, Energom builds industrial EV infrastructure. Where grid capacity is limited, energy storage can reduce or defer the need for a grid connection upgrade, depending on the charging profile, the available connection capacity and the storage sizing.

Request a Callback

Typical challenges and how we approach them

The fleet manager and the facility operator see different goals and different constraints. An EV charging infrastructure project is both a technical and a commercial decision — a wrong initial choice can mean a setback lasting years.

1. When can energy storage avoid a grid upgrade?

Challenge: A logistics center or industrial site with a fleet of 5-20 electric vehicles generates 200-400 kWh of daily charging demand. The site's grid connection, however, cannot be expanded quickly — a grid upgrade can take months and involve significant connection fees. Management views the investment in TCO terms: if the grid upgrade makes up a significant share of the total project cost, the return is questionable.

Solution: We design EV charging systems integrated with energy storage — the BESS (battery energy storage system) is continuously charged from the existing grid feed during off-peak tariff periods, and the fleet is charged from the storage during peak times. With the right charging profile, an existing 50-100 kVA feed can support 200-400 kW of DC fast-charging peak power, but only after sizing the simultaneity factor, DLM/CPMS control, BESS power and BESS capacity. If the measured profile does not support this, the grid upgrade cannot be avoided — we state this at the start of sizing. You get power supply and energy storage expertise from a single system integrator.

2. Fleet management and OCPP integration

Challenge: Operating multiple charging points simultaneously, billing, access control (RFID, app), dynamic load management (DLM / load balancing) — this is no longer hardware but software and operating platform territory. Vendor lock-in (a manufacturer's closed system) is costly and inflexible long-term. Without OCPP, a charger remains an isolated island.

Solution: We recommend OCPP-capable chargers (OCPP 1.6J support is a baseline requirement; 2.0.1 and 2.1 compatibility is checked against the manufacturer, firmware and CPMS) and integrate them with the chosen charge point management software (CPMS). A model without OCPP (for example the Delta AC MAX Basic) can only be connected to local, Modbus-based energy management. Dynamic load management balances load across charging points within the existing grid feed. RFID authentication, app access, billing integration (e.g. ERP). Charger model and CPMS are vendor-independent — the customer chooses, we design and install.

3. Mixed segment: AC parking + DC fast charging

Challenge: A retail center, parking garage or office building handles mixed demand: employees and residents use AC Type 2 (11/22 kW) chargers during the day; transit visitors look for DC fast chargers. The two segments require different cabling, different billing models and a different user experience.

Solution: We design mixed configurations — AC posts at long-stay locations, DC fast chargers at high-traffic spots. The charging area is sized to traffic forecasts and the property developer's communication needs. OCPP-capable chargers are managed in one CPMS — using an OCPP version jointly supported by the charger firmware and the CPMS — with a unified user experience. For property developers the EV network is an ESG reporting element and a tenant lease differentiator.

Recommended product categories

The EV solution spans four hardware areas: AC chargers, DC chargers, energy storage and energy management. The four elements are designed together to form the complete system.

AC Type 2 chargers (3.7–22 kW) — Residential, corporate parking, long-stay segments. Single- and three-phase configurations.

DC fast chargers (50 kW class) — Retail, plaza, busy junction. CCS2 connector, CHAdeMO on selected models.

DC ultra-fast chargers (200–500 kW, model-dependent) — Logistics fleet, highway service area, industrial high-power point.

C&I energy storage — With a suitable profile, the element that reduces the grid-upgrade need. From all-in-one systems expandable from 8 kWh to larger industrial storage.

Energy management systems — CPMS integration, dynamic load management, consumption monitoring.

C&I solar inverters — Hybrid solar integration for green-powered EV charging.

Related services

EV projects are unique on the services side — the path from design to operations is best kept with a single partner.

EV charger installation and commissioning — Design, cabling, installation, parameterization, load testing.

EV charging management (software, smart charging) — CPMS rollout, OCPP integration, dynamic load management.

Energy-storage-integrated EV solution design — Complex projects: BESS sizing, EMS integration.

EV maintenance and remote monitoring — Scheduled service, remote status monitoring, alarm handling.

Who we work with

The EV segment is not a single customer profile — fleet, retail and hospitality each call for different solutions.

Logistics centers and corporate fleets — 200-400 kWh daily charging demand, grid constraints, off-shift charging cycles. With a suitable profile, energy storage solutions deliver high value here.

Retail and shopping centers — Mixed AC + DC, guest experience, ESG criteria, lease differentiation.

Parking garages (public and private) — Base infrastructure (cabling, capacity preparation), gradual rollout.

HoReCa (hotel, restaurant, highway service area) — DC fast charging as traffic-attractor, increased dwell time.

Multi-residential / housing estates — AC Type 2 community chargers, submetering, common-cost integration.

Industrial sites (own fleet) — Mixed AC + DC, truck fleet, off-shift charging cycles.

Municipal / public institutions — Public-area placement; technical documentation and cost estimates for grant-funded projects.

Industries we serve →

EV Charging Infrastructure — Frequently Asked Questions

The most common engineering and design questions related to the EV charging infrastructure solution page — for fleet operators, office buildings, public parking facilities and C&I projects.

How long does it take to charge a 200 kWh fleet battery?

Charging time depends on the charger power used and on the charge acceptance of the vehicle battery. The 200 kWh battery of an electric truck or bus needs, from 0–80% SoC (160 kWh), a theoretical minimum of about 7.3 hours on a 22 kW AC charger (Type 2) — the typical overnight depot charging scenario, provided the vehicle's on-board charger accepts 22 kW. With a 50 kW DC fast charger the same takes a theoretical minimum of about 3.2 hours, with a 150 kW DC charger about 1.1 hours. These values assume constant power; in practice charging takes longer because, following the vehicle's charging curve, power drops as the state of charge rises, especially above 80%.

Effective charging power depends not only on the charger's rated power but also on the vehicle BMS's charge acceptance, the state of charge (SoC), temperature and grid connection capacity. In fleet planning all of these must be considered together.

We compute exact figures based on load-profile capture and schedule analysis. EV chargers in our range →

How much charger power does my fleet need?

The choice depends on vehicle type, daily mileage and the charging time window. Passenger car fleet (100-150 km/day): AC Type 2 (11-22 kW) overnight charging is typically sufficient. Light commercial fleet (150-300 km/day): DC 50-100 kW fast chargers during break periods (1-3 hours). Truck fleet (300+ km/day): high-power DC charging plus overnight DC depot charging. We size accurately with fleet simulation: daily routes, available charging windows, range buffer.

The power ranges of the available models are listed on the EV charger category page.

What is dynamic load management across multiple charging points?

Dynamic load management (DLM / load balancing) is a control mechanism that distributes the available grid power across multiple EV charging points. Static load management works with predefined fixed maxima per charger. Dynamic load management monitors the grid connection's instantaneous load (building + chargers + solar + storage) in real time, and distributes the remaining capacity across vehicles requesting charge.

Practical example: with a 100 kW grid connection, if the building consumes 60 kW and 4× 22 kW AC chargers are installed (88 kW rated total), dynamic load management automatically caps each charger at 10 kW — leaving 40 kW total for charging. As building consumption drops (e.g. after working hours), more power becomes available to the chargers.

Dynamic load management is a strategy for reducing grid upgrades: under the right simultaneity and usage profile, more charging points can be installed on the same fixed grid capacity, but the exact count must be sized from measured building demand and the charging schedule. Energy management systems →

How does EV charging fit into the existing building energy supply?

EV charging load can be significant relative to the existing grid feed, so the first design step is a survey of the existing supply. We measure peak load, phase balance and harmonic content (THD). Dynamic load management can be coordinated with building automation — EV charging uses only the residual capacity beside HVAC, lighting and production loads. Where the feed is tight, energy storage and/or solar integration can help, depending on the measured profile. The full system is supervised in an energy management system (EMS). Industrial energy management →

When does it make sense to combine EV charging with energy storage?

Storage-coupled EV charging can be justified in three typical scenarios. First: when grid connection capacity is insufficient for the desired charging power, the grid upgrade (new transformer, utility connection) cost or lead time is disproportionate, and the fleet's peak charging demand materially exceeds the available feed. A 150 kW DC charger can be delivered from a lower grid connection with a BESS if the charging profile, storage power and storage capacity support it. Second: when peak demand charges represent a significant operating cost — the BESS charges during low-load periods and discharges during peak hours. Third: when there is significant on-site solar generation and it is worth shifting that energy from daytime to evening EV charging.

Energy storage can therefore reduce or defer the need for a grid connection upgrade, depending on the charging profile, the available connection capacity and the storage sizing; if the measured profile does not support this, the upgrade cannot be avoided. The payback period is project-specific: we calculate it from the local tariff, contracted capacity, charger utilization and BESS size.

Energom provides the assessment and the economic calculation. Request a payback calculation →

What is OCPP, and which version is compatible with partner systems?

OCPP (Open Charge Point Protocol) is an open communication protocol between the charger and the charge point management software (CPMS, Charge Point Management System). An OCPP-capable charger can be managed from a CPMS if the charger firmware and the CPMS use a jointly supported OCPP version (e.g. 1.6J or 2.0.1) and the required functions (e.g. smart charging). OCPP thereby reduces vendor lock-in. Not every charger is OCPP-capable: for example, the Delta AC MAX Basic can only be connected to local energy management via Modbus RTU, while the OCPP-capable variant is the AC MAX Smart.

OCPP is currently used in several versions. OCPP 1.6J (JSON over WebSocket): a widely deployed de facto standard: charging transactions, status monitoring, fault notification and basic smart charging (ChargingProfile). OCPP 2.0.1: a newer-generation version with additional smart charging features, ISO 15118-based "Plug & Charge" support (when vehicle, charger and CPMS all support it) and improved security and communication functions. OCPP 2.1: a forward-looking specification worth checking for new projects, but not yet supported by every installed system. OCPP 2.0.1 support is growing in the CPMS market, but many existing installations still operate on 1.6J.

For chargers we recommend, OCPP 1.6J support is treated as a baseline requirement; on new projects we also check OCPP 2.0.1 and 2.1 compatibility against the manufacturer, firmware and selected CPMS — so the customer is not locked into one closed CPMS provider. EV chargers in our range →

Can DC fast chargers be installed in residential or office parking facilities?

Yes, but it is not always the optimal solution. DC fast chargers (from 50 kW) are justified in a residential or office environment when a significant state of charge must be reached during a short dwell time (e.g. transit-style parking, retail centers, taxi stands) — or when the required energy cannot be delivered with AC during the parking time.

In typical residential and office settings, however, AC Type 2 chargers (3.7-22 kW) are the right choice: the parking duration (8-12 hours overnight or during the workday) is enough to charge a 50-70 kWh vehicle battery in about 5-7 hours on an 11 kW charger. AC infrastructure is cheaper, requires less grid power and allows more charging points from the same grid capacity.

DC can be combined with AC — for example, mostly AC charging points plus a few DC points give flexibility for mixed use. Request a callback about the charger mix →

What is smart charging, and what are its benefits?

Smart charging is a broader concept that includes dynamic load management, time-based charging scheduling, tariff-based managed charging (V1G — unidirectional managed charging) and — in an advanced form requiring separate compatibility — vehicle-to-grid (V2G) capability. The principle: charging power and timing are controlled to fit grid conditions, tariffs, solar generation or the fleet schedule.

Practical benefits in industrial and commercial environments: (1) lower peak demand charges through peak shaving, (2) solar self-consumption optimization, (3) use of low-tariff overnight or weekend windows, (4) fleet-level charge coordination aligned with vehicle schedules, (5) reduced grid-upgrade scope, or avoidance for some usage profiles.

Smart charging can be implemented through a combination of OCPP 1.6J (ChargingProfile), OCPP 2.0.1 and an EMS; exact functions depend on charger, CPMS and firmware support. Our e-mobility services →

How long does a 4-6 charging point system take to deploy?

Survey and design typically take 2-3 weeks; the permitting process (grid connection, building permit where needed) can take from a few weeks to a few months, depending on the location and the authorities. Component lead times are model-dependent, typically several weeks. Physical installation (cabling, foundations, charger installation, commissioning) typically takes 2-4 weeks. Total turnaround is therefore typically several months; storage-integrated projects add further weeks for BESS design, sizing and integration. We provide a project-specific schedule after the survey. Design and installation →

Are EV investments eligible for grant funding?

EV infrastructure can be part of several Hungarian and EU funding schemes; current calls and eligibility should be checked with a grant consultant. We provide technical documentation, cost estimates and energy calculations for the application — the customer uses these together with their grant consultant. We do not provide grant consultancy, but we co-prepare the technical content. Request a quote →

More Questions?

Continue to the full FAQ → — or get in touch.

If your problem is different

EV infrastructure is often only the primary trigger — many customers want to optimize their entire energy system.

Industrial Energy Management — If alongside EV you want to manage total consumption, submetering and peak shaving at system level.

Uninterruptible Power Supply — If CPMS server or critical site infrastructure UPS protection is also part of the question.

Request EV project sizing

Our engineers deliver EV sizing, energy storage concepts and OCPP-based CPMS recommendations based on an on-site survey. The first consultation is non-binding.