System sizing combines critical load, tolerable transfer time and fuel reserve target. Configurations are available with auto-start, grid synchronization and coordinated UPS + genset control — designed and commissioned by one partner.

How to Choose a Generator?

Genset selection is part of the complete backup power chain — rarely a stand-alone decision. The criteria below help frame the procurement.

Fuel (diesel or gas)

Diesel is the classic choice — high reliability, long-storable fuel reserve, broad power range. Natural gas or biogas is preferable where a permanent gas connection exists on site — running costs can be lower, but it depends on the gas network.

Power and load matching

Selection of rated power (PRP — prime power, or ESP — emergency standby) is based on critical load and starting current peaks together. In a system combined with a UPS, the genset feeds the UPS input — the UPS input THD and frequency tolerance must also be considered.

Connection and transfer

Manual start is only for planned maintenance — for a critical site, auto mains failure (AMF) start and automatic transfer switching (ATS) is the industrial standard. Until the genset starts and the ATS transfers, the UPS supplies the load from its batteries; after transfer to the genset, the synchronization capability of the UPS input and bypass path (frequency and voltage tolerance) must be verified at design stage.

Fuel reserve and runtime

Rated runtime (typically 8-72 hours) depends on integrated tank capacity. Longer backup needs an external tank or a fuel resupply contract; whether it is required depends on the loads to be supplied, the facility classification and the project requirements.

Installation form factor

Containerized (sound-attenuated, outdoor), indoor genset room, or mobile trailer-mounted. The form factor depends on environmental requirements (noise, exhaust), available space and maintenance access.

Maintenance and test cycle

A standby genset only starts if regularly tested. Weekly or monthly start tests, annual load bank tests and oil changes are the basis of reliability — the maintenance contract is part of procurement.

Decision guide

SituationRecommended solutionWhyNext step
Short outages, critical IT load UPS with adequate battery backup Bridges the transfer and short outages UPS systems
Longer grid outage at a critical site Genset with automatic mains failure (AMF) start and ATS Long backup from fuel reserve Backup power
Permanent gas connection on site Gas-fueled genset (option to assess) Any cost advantage depends on fuel price, load, annual operating hours and maintenance; dependent on the gas network Request a quote
Existing, rarely tested genset Maintenance contract with load bank testing Only a regularly tested genset is reliable Maintenance and service

The Energom advantage

  • UPS and genset designed as a coordinated system by one partner.
  • Hospital and critical industrial infrastructure deployment experience.
  • Maintenance contracts with load bank testing and test logs.

Request a Custom Quote

We design a genset configuration sized to the critical load and the existing power chain (UPS, batteries).

Request a Quote Request a Callback

We respond to quote requests within 24 hours on business days and return callback requests within 4 business hours.