System sizing combines critical load, tolerable transfer time and fuel reserve target. Configurations are available with auto-start, grid synchronization and coordinated UPS + genset control — designed and commissioned by one partner.
How to Choose a Generator?
Genset selection is part of the complete backup power chain — rarely a stand-alone decision. The criteria below help frame the procurement.
Fuel (diesel or gas)
Diesel is the classic choice — high reliability, long-storable fuel reserve, broad power range. Natural gas or biogas is preferable where a permanent gas connection exists on site — running costs can be lower, but it depends on the gas network.
Power and load matching
Selection of rated power (PRP — prime power, or ESP — emergency standby) is based on critical load and starting current peaks together. In a system combined with a UPS, the genset feeds the UPS input — the UPS input THD and frequency tolerance must also be considered.
Connection and transfer
Manual start is only for planned maintenance — for a critical site, auto mains failure (AMF) start and automatic transfer switching (ATS) is the industrial standard. Until the genset starts and the ATS transfers, the UPS supplies the load from its batteries; after transfer to the genset, the synchronization capability of the UPS input and bypass path (frequency and voltage tolerance) must be verified at design stage.
Fuel reserve and runtime
Rated runtime (typically 8-72 hours) depends on integrated tank capacity. Longer backup needs an external tank or a fuel resupply contract; whether it is required depends on the loads to be supplied, the facility classification and the project requirements.
Installation form factor
Containerized (sound-attenuated, outdoor), indoor genset room, or mobile trailer-mounted. The form factor depends on environmental requirements (noise, exhaust), available space and maintenance access.
Maintenance and test cycle
A standby genset only starts if regularly tested. Weekly or monthly start tests, annual load bank tests and oil changes are the basis of reliability — the maintenance contract is part of procurement.
Request a Custom Quote
We design a genset configuration sized to the critical load and the existing power chain (UPS, batteries).