The primary application is powering substation protection and control systems — where breakers, protection relays and indication systems must continue to operate from the 220 VDC bus during a grid outage. A complete plant includes the battery bank (typically OPzV, OPzS or LiFePO4), rectifiers, distribution and a monitoring module.
How to Choose a 220 VDC System?
A 220 VDC plant is a specialized segment: sizing follows standards (IEC, EN), design is reference-driven, and procurement is for decades of service life. The criteria below help frame the technical specification.
Load profile and autonomy
The protection system draws low steady-state current, but breaker trip currents and inrush spikes multiply this several-fold for short windows. Autonomy is typically 8-10 hours at critical substations — sized against grid restoration time and maintenance access time.
Battery technology
OPzV (valve-regulated, gel electrolyte, VRLA) is the standard for typical substations — no water topping-up required, with a manufacturer's design life of 20 years for FIAMM SMG (OPzV) cells (a design figure, not a guaranteed service life); periodic checks (cell voltage, temperature, impedance, valves) are still required per the manufacturer's instructions. OPzS (flooded, vented) for harsher environments and longer life expectations; here electrolyte level checks and water topping-up as needed are part of maintenance. LiFePO4 only if the existing rectifier CC/CV curve and BMS protocol are compatible.
Redundancy (N+1) and dual feed
The criticality of the protection system makes N+1 rectifier redundancy — at more critical substations even fully duplicated 2 × 100% charger and battery paths — and two independent AC feeds standard practice; the design is set by the protection system specification and the operator's requirements. Switchover time and control logic are driven by the protection system specification.
Inverter (DC/AC) integration
Some applications (control, signaling) also require 230 VAC — an integrated inverter module provides stable AC output from the 220 VDC bus without a separate UPS.
Monitoring and communication
SNMP, Modbus RTU/TCP, IEC 61850 (where SCADA requires it) — integration into protection and energy SCADA. Cell-level voltage monitoring, ground-fault detection and impedance testing (cell condition indicator) should be specified at procurement.
Lifecycle and spare-parts availability
Protection infrastructure runs in a 20-30 year lifecycle — manufacturer spare-parts availability and support policy are part of long-term TCO.
Request a Custom Quote
We design a compatible configuration based on your existing substation protection specification and SCADA requirements.
Request a Quote Request a Callback
We respond to quote requests within 24 hours on business days and return callback requests within 4 business hours.