Uninterruptible Power Supply for Industrial and Commercial Facilities

Energom Electronic Kft. designs, installs and maintains UPS systems for industrial and commercial facilities, drawing on 25+ years of experience — from topology selection to lifecycle services. An unplanned power outage can mean production line downtime, data loss or a safety incident. Let's discuss the risk before an event happens.

Request a Callback

Typical challenges and how we approach them

In the Hungarian industrial and commercial segment, three recurring situations bring engineering managers to us: sizing a new investment, refurbishing an ageing system, and expanding capacity. Each problem calls for a different decision model and a different technical answer.

1. Business continuity risk in a new or expanding system

Challenge: An unplanned power outage on the production line can cause a stoppage measured in hours, damaged CNC controls or data loss. The risk is measured in business continuity (BCP), not in power supply — penalties, insurance claims, customer loss. The engineering manager is not buying a UPS; they are reducing the cost of the worst-case scenario.

Solution: We design sized UPS systems based on the tolerable outage window and the critical load. The configuration covers topology (online (double-conversion) UPS), redundancy (N+1 or 2N) and battery technology (AGM, OPzV, LiFePO4). After the site survey and instrument-based measurement (load profile, power quality audit), the quote is built on data, not on a catalog. The full lifecycle stays with one partner: design, installation, commissioning, maintenance.

2. Ageing UPS, mandatory upgrade

Challenge: A UPS system often becomes outdated after 8-10 years, but full replacement is costly and carries downtime risk. A replacement without a lifecycle plan creates a forced situation — urgent procurement, limited choice, premium pricing. Battery capacity loss is often not tracked, so the failure comes as a surprise.

Solution: Through battery capacity testing and UPS retrofit, we extend the system's operating life. Where full replacement is justified, we design a phased migration with a controlled load transfer: the load is moved step by step from the old UPS to the new one according to an approved changeover plan. Depending on the existing infrastructure (e.g. maintenance bypass, redundant feeds), the changeover can also be done without downtime; this is clarified during the survey. Where the facility requires Tier III concurrent maintainability, the concept is built around it. Proper timing avoids forced procurement and the risk of a service-level breach.

3. Non-scalable UPS, growing capacity demand

Challenge: The data center or industrial control room shows growing capacity demand, but the existing UPS is not scalable. The monoblock UPS must be replaced, or a parallel unit must be added next to it — requiring footprint and cabling.

Solution: We design modular UPS architecture with N+1 redundancy and hot-swap modules. Within the available capacity of the frame, the system can be expanded by adding modules during operation, as supported by the manufacturer; expansion beyond the frame capacity requires separate design. While one module is replaced or repaired, the other modules stay under load; the conditions for maintaining common elements (e.g. static bypass, control) depend on the type and the system design. SNMP, Modbus and BACnet integration with the existing DCIM or building automation — supervision remains on the platform you already use.

Recommended product categories

The categories below cover the hardware needed for a UPS solution. We design these categories together — a UPS alone is not a system, it is a component.

UPS systems — The backbone of business continuity. The range spans from 400 VA to several MW, from low-power line-interactive and offline units through online (double-conversion) UPS to modular data center systems.

Industrial batteries — The basis of backup time. AGM, OPzV, OPzS and LiFePO4 chemistries, selected to match the application's lifetime requirement.

220 VDC systems — Auxiliary power for substations and control rooms where the protection system is DC-fed.

Energy management systems — Monitoring of the UPS and the full load, the basis for alerts and predictive maintenance.

Generators (gensets) — During longer outages (multiple hours), UPS and generator coordination ensures continuous operation.

Energy meters and current transformers — Accurate load analysis to determine sizing and redundancy level.

Related services

Hardware is only part of the solution. Lifecycle services are what actually deliver the designed availability.

Site survey and energy audit — On-site survey, load and power quality audit as the basis for sizing.

Design and turnkey installation — Topology choice, cabling, commissioning with a single accountable partner.

UPS maintenance — Scheduled preventive maintenance (PM), SLA-based contracts with Standard, Premium and 24/7 levels; response time and on-site arrival time are set in the individual contract.

Battery maintenance and capacity testing — Internal resistance measurement as a condition indicator, load-based discharge capacity testing, lifetime estimation, replacement planning.

Who we work with

UPS solutions cover different risks in different industries. We work most often in the segments below — each with a different critical load, autonomy requirement and standards profile.

Data centers — Where even a short outage can mean service disruption and data loss. Modular UPS, battery monitoring, redundancy matched to the facility's Tier concept.

Banks and financial institutions — IT downtime can mean transaction failure and a compliance incident. Online (double-conversion) UPS with redundant feeds.

Manufacturing plants — Sensitive CNC, robotic and line controls. Downtime is not just lost output — restart adds scrap and recalibration time.

Hospitals — Imaging equipment, intensive care. We develop backup power sized for critical hospital loads together with the designer, based on the installation standard (HD 60364-7-710) and the classification of the medical locations; the UPS units themselves are built to the IEC/EN 62040 product standard family.

Telecommunications — Base stations, switching centers, core routers. An outage can mean coverage loss and regulatory consequences.

Logistics centers — Continuous power for automated warehouse systems (WMS), high-bay control, packaging lines.

Industries we serve →

Uninterruptible Power — Frequently Asked Questions

The most common engineering and design questions related to the uninterruptible power (UPS) solution page. General questions that span several solutions (quote requests, service, OCPP etc.) are covered in the main FAQ.

What is the difference between online (double-conversion) and line-interactive UPS?

An online (double-conversion) UPS, in double-conversion mode, converts mains AC to DC and back to AC — the output is a regulated sine wave, independent of input voltage and frequency variation. On mains failure the inverter keeps supplying the load without interruption, now from the battery, so there is no transfer time (0 ms). This applies to double-conversion operation; in high-efficiency (ECO) or bypass mode the load is fed from the mains, and the transfer conditions are given in the model's datasheet.

A line-interactive UPS, in normal operation, passes mains voltage to the load through an automatic voltage regulator (AVR), and only switches to battery-fed inverter operation on mains failure — with a transfer time of a few milliseconds (model-dependent). The IEC 62040-3 classification: VFI (online) vs. VI (line-interactive).

For industrial critical loads (CNC, robotics, data center, hospital) we recommend online UPS; in small office environments line-interactive may be sufficient. UPS systems →

How long does it take to install a 100 kVA UPS system?

A 100 kVA industrial online UPS — including survey, design, delivery, wiring and commissioning — typically takes 6-10 weeks. Typical timeline: 1-2 weeks for site survey and load analysis, 1 week for engineering and quote, 4-8 weeks for manufacturer delivery (depending on stock availability vs. made-to-order). On-site installation and commissioning (cabling, battery bank assembly, parameterization, load testing) typically takes 3-5 working days; a controlled load transfer from the existing UPS can add 1-2 days.

Duration is driven by the chosen battery technology, required site modifications (electrical connection, cooling, footprint), the manufacturer supply chain and any phased migration. The time window is aligned with the site's maintenance schedule, because critical systems do not tolerate daytime outages.

In urgent cases (failure, forced replacement) we can also propose a temporary solution from our own stock. Site survey →

How often do batteries need to be replaced?

The manufacturer's design life is a design value referenced to 20 °C, not a guaranteed service life: for FIAMM AGM monoblocs it is 10–12 years or more than 12 years depending on the type, and 20 years for OPzV (SMG) and OPzS (LM) tubular cells. Above 20 °C the expected life is shorter (for FIAMM FHT2, for example, 7 years at 35 °C). Actual life depends on temperature, the number and depth of discharges, and charger settings. For LiFePO4, manufacturers state cycle life under defined conditions (e.g. Pytes E-BOX 48100R: 6,000 cycles at 0.5C, 25 °C, 90% DoD; TAB e.motive: 2,000 cycles at 0.5C, 80% DoD).

We therefore plan replacement based on measurement, not the calendar: internal resistance (Ri) is a condition indicator, while actual capacity is determined by a load-based discharge capacity test (Cn test). End of life is defined by the manufacturer's criterion (for FIAMM batteries, measured capacity below 80% of nameplate); we time replacement according to this criterion and to whether the bank can still deliver the required backup time. Test frequency is set in the maintenance contract.

Measurement-driven replacement planning avoids emergency replacement. Battery maintenance →

Can we retrofit an 8-10 year-old UPS, or do we always need a new system?

In many cases, yes. A retrofit can extend useful service life by several years and is typically cheaper than full replacement; we quantify the expected life extension and savings after the site survey. Retrofit usually includes control board and communications module replacement, capacitor and fan replacement, re-sizing of the battery bank, firmware update and recalibration.

Feasibility depends on parts availability (manufacturer support), the condition of the main power electronics (IGBT, transformer) and compatibility with new requirements (e.g. SNMP/DCIM integration). A new system is justified if capacity demand exceeds what the existing system can be expanded to, if the power electronics is also aged, or if the manufacturer has placed the model into EOL without spare parts support.

After the survey we prepare comparable proposals for both retrofit and full replacement. Maintenance and service →

How do we choose the redundancy level (N+1 vs. 2N)?

N is the number of UPS modules required to serve the critical load. N+1 means one extra module is available — if one fails or is out of service for maintenance, the load remains fully covered. 2N means two independent UPS systems, each capable of carrying the entire load, with separate distribution paths.

The choice depends on tolerable risk, operating requirements and lifecycle cost. The Uptime Institute Tier levels are topology requirements for the entire facility infrastructure (Tier III: concurrent maintainability, Tier IV: fault tolerance), not availability guarantees. A Tier III concept can, for example, be built with N+1 UPS and dual distribution paths, while Tier IV typically requires a 2N architecture; the actual design depends on the full architecture.

For most industrial applications N+1 is sufficient — 2N roughly doubles the capital investment. Availability percentages should only be stated once the full system architecture, operating practice and measurement period are known; risk analysis is part of our survey. Request a callback →

What is SNMP / Modbus monitoring and how does it integrate with existing DCIM?

SNMP (Simple Network Management Protocol) and Modbus are the two most common communication protocols for UPS monitoring. SNMP is IP-based, typically used in data center and IT environments; industrial UPS manufacturers support it as standard or via an optional communication module. Modbus is serial (RS-485) or TCP/IP-based, typical of industrial automation, and integrates with PLC, SCADA and building management (BMS) systems; in building automation BACnet is also common.

The UPS reports input and output voltage, load, battery state, temperature and alarms. It typically connects to an existing DCIM (Data Center Infrastructure Management) system via SNMP using the standard UPS-MIB (RFC 1628) or the vendor MIB, and via object mapping in the case of BACnet. Analysis of long-term trends (rising internal resistance, fan speed deviation) is the basis of predictive maintenance.

Monitoring platforms are presented under energy management systems and in our monitoring and optimization service.

More Questions?

Continue to the full FAQ → — or get in touch.

If your problem is different

UPS is the most frequent entry point, but not always the right one. Two of our other solution areas address related risks with different technical choices.

Backup Power — When risk is measured in hours and days, not milliseconds. Generator and UPS coordination for longer outages.

DC Power Systems — When the target supply is a protection system, rail signaling or a substation. 220 VDC, 48 VDC, 72/110 VDC.

Keep your operations running

Request a tailored quote — our engineers deliver sizing, topology recommendations and a business rationale based on an on-site survey.

Request a Quote

We respond within 24 hours on business days. +36 1 459 8010 energom@energom.hu