What We Do — Process From Your Perspective
- You contact us — describe the UPS type, location and last service date. If there is no record, say so — we'll assess directly.
- Our engineers perform an on-site condition assessment — or evaluate remotely from existing documentation (for smaller / well-documented systems).
- You receive a tailored maintenance plan and quotation — annual SLA contract or one-off, whichever you prefer.
- We arrive at the agreed time — with our own tools and instruments, manufacturer diagnostic equipment and the most common spare parts.
- You receive a written service report after maintenance — assessed condition, work performed, residual risks, action recommendations with a timeline.
Scope — Structured List
- Visual and thermal inspection — full external and internal review, hot-spot measurement with thermal imaging (capacitors, IGBT block, busbars and connections, fuses)
- Battery condition assessment — cell voltage, internal resistance (Ri) as a condition indicator, thermal gradient; actual capacity is determined by a load-bank capacity test (see battery maintenance)
- Capacitor and fan check — ESR measurement where required (capacitors are the most common life-limiting component), fan lifetime estimate
- Control board and communication module firmware update — latest stable manufacturer version, with compatibility validation
- Calibration and parameter check — voltage and frequency thresholds, battery charging parameters, alarm levels
- Bypass test — manual and automatic bypass mode switching during operation
- Generator / genset synchronization test — where present, full ATS / generator / UPS chain joint test
- Full load test with a load bank — optional, project-dependent (recommended for larger systems and high-criticality sites)
- Written report and maintenance log documentation — reference point for the next service visit
What Is NOT Included
- Commissioning of a new UPS — billed separately under Design and Installation
- Full battery bank replacement — separate item, see Maintenance and Service group page → UPS Battery Replacement
- UPS retrofit / refurbishment — separate project, Maintenance and Service group page → UPS Retrofit
- Detailed power quality audit (THD, harmonic analysis, peak shaving advisory) — see Monitoring and Optimization
- Reactive troubleshooting outside maintenance windows — handled under SLA contract
When You Need It — Triggers
- The UPS system has not been serviced for 12+ months
- Battery 4+ years old or considering a generation change
- New facility owner or operator (takeover, where service history is unknown)
- Manufacturer warranty about to expire, and you seek long-term support
- Error message, alarm, post-event review (in that case immediate troubleshooting is more appropriate — see Maintenance group page)
What Is the Risk If It Doesn't Happen
A missed battery replacement can cause significant direct cost in a single unexpected outage — on top of the business impact of downtime (production loss, data center SLA penalties, hospital critical load). The annual cost of preventive maintenance is typically only a fraction of this.
The real danger: a capacity-degraded battery reports false capacity to the supervision system. The monitoring interface may show the nominal autonomy — but at the critical moment, the actual backup time can be much shorter, in extreme cases close to zero. For aging battery banks, capacity testing therefore cannot be skipped: a bank operated without capacity testing is not uninterruptible — only presumed to be.
Pricing Factors
- UPS type and capacity — 10-20 kVA monoblock, 200 kVA+ modular or 1000 kVA+ data center system
- Location — Budapest, elsewhere in Hungary, or another country in the Central and Eastern European (CEE) region
- SLA level — Standard, Premium or 24/7
- Service history — known / unknown (the latter requires more labor hours)
- Battery bank size and technology — cell count, AGM / GEL / OPzV / OPzS / LiFePO4
A one-off inspection of a 10-20 kVA UPS typically takes 1 business day — request a tailored quotation.
SLA / Response Time
- Standard — annual fee structure, preventive maintenance and reactive service with fault reporting on business days
- Premium — for critical operations, with a shorter response time
- 24/7 — fault reporting also at weekends and at night
Fault reporting, response time and on-site arrival time are set per level and per site in the individual contract; hourly rates are given in the individual quotation.
Related Products
- UPS systems
- Industrial batteries
- SNMP / Modbus communication cards (on the UPS systems page)
- Battery cabinets (on the UPS systems page)