Frequently Asked Questions
On this page Energom Electronic Kft. has collected the most common decision-maker and engineering questions about the design, procurement and operation of industrial power projects. If you don't find your answer below, please get in touch — our experts will help you personally.
Solution-specific questions (sizing, technology selection, application detail) are answered in the FAQ section of each solution page; the list of topics is at the bottom of this page. See also: Our Solutions.
What is a UPS and when do I need one?
A UPS (uninterruptible power supply) is a system that, when the mains supply fails or its quality degrades (voltage variation, frequency deviation, micro-interruption), continues to feed the critical load from its battery bank. With an online (double-conversion) UPS this happens without interruption; with other topologies it involves a short transfer.
You need one when a power interruption causes measurable business loss: production line downtime, data loss, IT service outage or a safety incident. Typical application areas: data centers, banking IT, hospital medical equipment, manufacturing CNC and robot control, telecom switching, railway and power plant auxiliaries.
The starting point for the choice is the tolerable interruption window (milliseconds or minutes) and the critical load. From these we derive the topology (online (double-conversion), line-interactive, offline) and the autonomy (backup time). Continue to the uninterruptible power supply solution page →
How do we select the right UPS size?
Sizing starts from three factors: the actual consumption of the critical load (kVA / kW), the power factor (PF) and the planned headroom for growth. The rated UPS capacity is typically selected so that the planned load sits at 60–80% of the rating — this gives good efficiency and a reserve.
Equipment nameplate ratings can be misleading — actual consumption is established by measurement (typically a 24–72 hour load logging campaign). The second factor is autonomy: how many minutes the system must run on battery before the generator takes over the load or the process can be shut down safely.
In industrial practice 10–15 minutes is a common starting point; in data centers with a generator, 5–10 minutes is often enough. We do the exact sizing based on an on-site load analysis. Request a quote with a site survey →
What backup time should we size the batteries for?
Backup time (autonomy) depends on the critical process. For a data center it is typically 5–15 minutes — enough for the generator to take over or for virtualized workloads to be migrated safely. For manufacturing CNC and robot control, 5–10 minutes is often enough for a controlled shutdown. For critical loads in hospitals, the requirements for the backup supply are set by the facility's designer based on the installation standard (MSZ HD 60364-7-710) and the medical classification of the rooms; we size the system accordingly.
Where there is no generator and the process must tolerate longer outages, autonomy stretches to 30–60 minutes or more — in that case a generator combined with a UPS battery sized for shorter bridging is usually more economical. For high-cycle applications (e.g. peak shaving) LiFePO4 is typically the better choice; for rare, deep-discharge industrial applications AGM or OPzV.
We determine the exact sizing from the critical load, the presence of a generator and the planned service life. Request a callback →
What does a TCO approach mean for a UPS investment?
TCO (Total Cost of Ownership) brings the costs of the UPS system's planned life cycle into a single calculation: purchase price + installation + operating cost (energy, efficiency losses) + maintenance + battery replacement + the risk of unplanned downtime × the estimated cost per event.
A UPS with a low purchase price but lower efficiency can cost more over its life cycle than an alternative with a higher initial price and better efficiency. Example: at a continuous 100 kW load, the difference between 95% and 97% efficiency is about 2.2 kW of input power, which in continuous operation adds up to about 19 MWh of energy per year; the financial impact depends on the current energy price. A LiFePO4 battery can be more favorable than AGM over the life cycle despite its higher purchase price if the application involves many cycles or high operating temperatures — we calculate this per project.
A TCO-based quote tells you more about real costs than the purchase price alone. Request a quote with a TCO calculation →
Which standards apply to UPS systems and the related installations?
The product standard family for UPS systems is IEC 62040 (European adoption: EN 62040, Hungarian adoption: MSZ EN 62040). Its parts: 62040-1 (safety), 62040-2 (EMC), 62040-3 (performance specification and test methods). IEC 62040-3 classifies UPS performance by input dependency: VFI (Voltage and Frequency Independent — the output is independent of input voltage and frequency variations), VI (Voltage Independent — the output is independent of input voltage variations but not of frequency) and VFD (Voltage and Frequency Dependent — the output depends on both). As typical examples, an online (double-conversion) UPS is classified VFI, a line-interactive UPS VI and an offline UPS VFD. These are product requirements: they describe the equipment, not what backup supply is mandatory in a given facility.
On the installation side, other requirements may be relevant: MSZ HD 60364-7-710 covers electrical installations in medical locations, MSZ EN 50171 covers central power supply systems for safety lighting, and EN IEC 62485-2 covers the safety requirements of stationary battery installations (for example ventilation sizing). In railway environments, the requirements of EN 50121 (EMC) and EN 50125 (environmental conditions) may apply according to the project specification. Which requirement is mandatory in a given facility depends on the type of facility, the classification of the rooms and the designer's specification.
Compliance is not just a standard reference — it is documented evidence: manufacturer declarations, test reports, commissioning documentation. Ask your question →
What does an SLA define about service response?
The SLA (Service Level Agreement) is the part of the service contract that governs fault reporting, response (for example the start of remote diagnostics) and on-site arrival. These three points in time are not the same, so the contract handles them separately.
Our maintenance contracts offer Standard, Premium and 24/7 SLA levels. Fault reporting, response time and on-site arrival time are set per level and per site in the individual contract. Facilities with critical loads typically justify a higher level; for redundant or less critical systems the Standard level may be sufficient.
In addition to the response terms, the contract specifies parts availability, planned maintenance intervals and the escalation procedure. For urgent cases, call us directly: +36 1 459 8010. Continue to the maintenance and service page →
Can Energom maintain another manufacturer's UPS?
Yes — our service offering is vendor-independent. We service equipment from multiple manufacturers as a single partner: the Riello UPS systems we distribute, and other manufacturers' equipment as well. This is particularly useful at larger sites where products from several manufacturers have been installed over the years.
Vendor-independent service works with type-specific diagnostics (firmware, calibration, communication). Which manufacturer tools and spare parts are available for a given model is clarified during the survey.
Spare parts are supplied from our own warehouse and through manufacturer partner channels. The exact scope is recorded in the individual quote. Continue to the maintenance and service page →
What is the difference between C&I energy storage and a solar inverter?
A solar inverter converts the direct current (DC) from photovoltaic panels into alternating current (AC) — for direct consumption or grid export. On its own it does not store energy and only produces when the panels generate.
A C&I energy storage system (BESS — Battery Energy Storage System) is a lithium battery system that stores energy and releases it in a controlled way. It can be used on its own or together with a solar PV system: storing surplus generation for later use (self-consumption optimization), peak shaving, or backup supply for critical loads. A hybrid inverter handles both the PV and the battery conversion in one unit; the energy is stored in the battery connected to it.
The choice depends on the goal: pure solar self-consumption → inverter; peak shaving or energy storage → BESS; combined C&I project → hybrid inverter with battery, or a separate BESS and inverter, depending on size. Continue to the industrial energy management solution page →
Solution-specific questions
The following topics are answered in the FAQ section of the relevant solution page:
- Uninterruptible power supply — FAQ UPS topologies, battery replacement, UPS retrofit, redundancy (N+1, 2N)
- DC power systems — FAQ 220 VDC, 48 VDC and railway DC systems, battery technologies
- EV charging infrastructure — FAQ EV charging with energy storage, OCPP, dynamic load management (DLM / load balancing)
- Industrial energy management — FAQ Peak shaving, EMS, submetering, ISO 50001
- Backup power — FAQ UPS and generator coordination, STS and ATS, generator testing