E-Mobility Services — EV Charging Site Design, Installation and Management
Fleet electrification often looks like a simple charger installation at first glance — until it turns out that the existing grid connection cannot handle the simultaneous peak load of 8 chargers, or that a utility grid upgrade involves long lead times and significant cost. The approach of Energom Electronic Kft. is reducing or deferring the need for a grid connection upgrade by integrating energy storage — depending on the charging profile, the available connection capacity and the storage sizing. We deliver charger installation, charge point management and load balancing manufacturer-independently: primarily with the ABB, Delta Electronics and Zencar chargers we officially distribute, and with other manufacturers' equipment as well — backed by 25+ years of industrial power supply experience. We provide this service across the Central and Eastern European region.
EV Charger Installation and Commissioning
AC chargers (Type 2, 3.7–22 kW), DC fast chargers (50 kW class) and DC ultra-fast chargers (200–500 kW) — according to the ABB and Delta families we distribute. Installation starts with designing the entire electrical infrastructure chain: grid connection capacity assessment, cable sizing, protection (RCD, surge protection, fire protection), earthing, communication network (Ethernet / 4G / WiFi), parking layout and cable run constraints. Commissioning includes connecting OCPP-capable chargers to a charge point management system (CPMS) if requested, payment integration (RFID, app, credit card) and monitoring setup.
When you need it:
- new fleet base or depot EV charging site
- expanding chargers at an existing site
- employee parking enhancement
- customer parking (public) charging point
- multi-site EV strategy launch.
Charge Point Management (OCPP)
A standalone charger only manages its own outputs — an EV charging site behind an OCPP-compatible charge point management system (CPMS) is one operational unit. OCPP 1.6J / 2.0.1-based charge point management (the supported version depends on the charger model; not every variant is OCPP-capable) enables: access control (RFID, app, employee list), tariff models (different groups at different rates), load balancing (see dynamic load management), monitoring and billing, multi-site consolidated supervision. We integrate chargers manufacturer-independently — you don't have to lock into one manufacturer's CPMS if you choose a different brand for fleet base expansion later.
When you need it:
- site with 5+ charging points
- mixed user base (employee + guest + fleet vehicle)
- EV charging network across multiple sites
- centralized billing or cost allocation requirement
- public charging point (e-roaming, payment integration).
Energy Storage-Coupled EV Solution
The most common cost driver in fleet electrification is not the charger itself but expanding the grid connection. If the existing transformer and cabling provide 200 kVA, and 8 × 22 kW AC chargers at simultaneous peak load demand 176 kW, the chargers alone take up most of the connection — whether it still fits together with the depot's other simultaneous load is decided by a load measurement that also accounts for the power factor. The classic solution is a grid upgrade: utility coordination, a lengthy approval process and significant connection cost.
A C&I energy storage-coupled solution can reduce or defer the need for a grid connection upgrade, depending on the charging profile, the available connection capacity and the storage sizing: the storage charges during the day from the existing grid (or solar), and the fleet's evening / night charging peak is supplied from storage. The payback period is project-specific: it depends on the connection limit, the power and capacity of the storage (BESS), the charging windows, the tariff and the DLM/CPMS control; we calculate it from measured consumption data. We design and deliver this approach with full responsibility: EV charging site sizing, energy storage sizing, EMS programming, commissioning.
When you need it:
- fleet electrification where you want to reduce or defer a grid connection upgrade
- 5+ EVs night-charging at one depot
- increasing self-consumption of an existing solar system with EV charging
- simultaneous peak shaving objective
- industrial site where utility expansion is not an option (time, cost).
Dynamic Load Management (DLM / Load Balancing)
Static and dynamic load management (DLM / load balancing). Static: the EV charging site peak is capped, chargers share available capacity among themselves. Dynamic: matched to the site's actual real-time consumption — chargers deliver higher power when other load is low (e.g. night, weekend). In suitable profiles, dynamic control can transfer substantially more useful charging energy through the same grid connection; we model the extent from measured load curves and simultaneity factors. We implement integration via OCPP, Modbus and CT-based metering combined.
When you need it:
- expanding EV charging at an existing site under limited grid capacity
- reducing fleet peak coincidence factor
- tariff optimization (shifting charging to lower-rate periods)
- EV charging alongside existing industrial consumption.
Not Sure Which Service You Need?
- Building a new EV charging site at a depot / parking lot → EV charger installation + OCPP charge point management
- Reducing or deferring a grid upgrade → Energy storage-coupled EV solution
- Existing EV charging site is fragmented, no central supervision → OCPP charge point management
- Maximizing charging on a constrained grid connection → Dynamic load management
- Central cost allocation for a multi-site fleet → CPMS introduction and integration
Related Product Categories
Let's Talk About Your Fleet
Tell us how many vehicles, daily mileage, depot characteristics, existing grid connection — we will outline the options (classic installation, storage-coupled solution, dynamic load management) and show the cost and payback period calculated for each.